HIGHWAY 50 GOLD GETTING CLOSE TO SULLY 2
HIGHWAY 50 GOLD PROVIDES DRILLING UPDATE FOR MONROE PROJECT Drill hole Highway 17-003 is currently at a depth of 785 metres and was drilled with HQ diameter core (6.5 centimetres). Management had projected the Sullivan Time interval to be intercepted between 550 metres and 600 metres. The drill hole is currently at 785 metres and […]