Historic drill results from Ana Paula
Here are the drill results from Goldcorp’s last drill program at Ana Paula The best hole, drill hole AP-05-05 was the most mineralized of the program, averaging 0.504 g/t Au over a 412.25 m length of the drill hole. That is easily one of the best holes i have seen since the Los Filos mine […]